[Function]
Burn up molding powder, paint coating and oil stain
on the metal surface at high temperature to reach the aim
of being stripped.
[Construction features]
There are main burning room, main baking
room and re-burning room. The temperature of main burning
room is lower than 900 of
main baking room is lower than 400 can
be controlled,of re-burning room is lower than 1300 .
Working cycle is about 3 to 7 hours. Workpiece is put into
the main baking room to avoid the direct burning of flame.
The equipment has water spray system. Discharge of SO2
and NOx is in accordance with the national environmental
protection.
[Range of application]
Clean and strip coating of metal
workpiece and spraying,coating parts ,Remove oil stain on
the surface of machine element.
[Specification]
|
Type
|
External
dimension |
Volume
m2 |
| L |
W |
H |
| MI-1 |
2800 |
2300 |
2300 |
6.5 |
| MI-2 |
2600 |
2000 |
2300 |
5.0 |
| The dimension of
main baking room can be designed on the clients' workpiece
and daily capacity. |
|
|